PE-11 Emergency power
What the standard requires
Provide an uninterruptible power supply to facilitate [an orderly shutdown of the system | transition of the system to long-term alternate power] in the event of a primary power source loss.
Quoted verbatim from NIST SP 800-53 Rev 5 (OSCAL catalog), which is in the public domain.
Maps to 1 control in 1 other framework
| Framework | Control |
|---|---|
| HITRUST CSF v11 | 08.b.02 Equipment is protected from power failures and other disruptions |
Mappings are CMDash’s own, seeded with the product and shown on both frameworks they connect. In the product they mean evidence you attach here also counts against the controls listed above.
Track PE-11 with evidence behind it
In CMDash this control is a row with an owner, a status, uploaded evidence kept with its full history, and an export an assessor can read.