· CMDash Team · 4 min read
IACS UR E26 and E27: what a ship operator and a maker each have to produce
UR E26 and UR E27 split the work between the ship and the equipment supplier. Who is in scope, from which contract date, and which documents each side hands over, read from the IACS resolution pages.
Read the post →